                            GEODIS IP ITALY




                            Moves Electrical Equipment



                            to Algeria for ABB













                            When L&T Construction needed to ship large
                            electrical equipment from Italy to Algeria, they
                            came to GEODIS for help. The project was a
                            reconstruction and rehabilitation of an electricity
                            network in inland Algeria. L&T first made con-
                            tact with GEODIS UAE. The UAE team then con-
                            tacted GEODIS IP Italy and GEODIS IP Algeria to
                            run the project.
                            Two shipments in September and October were
                            used to move 12 multifunctional modules fixed
                            on mobile trailers from Italy to the inland site in
                            Algeria’s Hassi Berkine Basin. The total shipment
                            from manufacturer Hitachi ABB Power Grids Italy
                            Spa weighed 947 metric tonnes with a size of
                            over 3,000 cubic metres. The individual trailers
                            were over 4 metres high, and ranged in length
                            from 12 to 20 metres.

                                                The team members
                                                began with lashing ac-
                                                tivities as they recei-  finished, the modules moved over 1,000 kilome-
                                                ved the Free On Board   tres by road for 4 days to the final.
                                                shipments  at  Porto
                                                Marghera in Venice.   One of GEODIS’ core values is to always deliver
                                                From there, the vessels   a perfect service. This project certainly lived up
                                                sailed for 5 days to the   to that commitment. The deliveries went excep-
                                                Algerian Port in Mo-  tionally smoothly,  especially given the fact that
                                                staganem, followed by   the project occurred during the COVID-19 pan-
                                                expert customs proce-  demic. All team members from GEODIS IP Italy
                                                dures. Once these were   and GEODIS IP Algeria showed professionalism
                                                                      and efficiency as they worked from home to get
                                                                      the job done. All of the equipment arrived at the
                                                                      end site on time and in perfect condition, helping
                                                                      the electricity network get up to speed again.