How operate a Ship-lift?
ANIMATION OF THE In the following, we will try to explain briefly the steps
that take place during the lifting and launching operation
SHIPLIFT OPERATIONS of mega yachts.
In order to lift up a mega vessel, the first phase is to
submerge the platform up to the sea bed draft height
and after the vessel can move to moor inside the dock.
Mooring can be assisted by cabstains winches installed
along the dock walls.
Afterward vessel mooring, platform rises until the keel
blocks and engages the ship.
Now the vessel is secured and can be lifted up to quay
elevation by winches and transported on the yard by
land carrier system.
After the steel platform is secured by blocks; the land
carrier can drive in platform below the mega yacht and
engages the trestles by hydraulic jacks.
With this condition accomplished, the land carrier
transports the vessel to the destination yard’s slot.
Launching procedure is as above reversal.
Conclusions
“You should know that, the realization of the ShipLift
project was a big satisfaction for our company” – starts
Franco Pedron, Sales Director of Scandiuzzi – “we
started our history in 1978 as small steelwork
manufacturer and then the years pass and Scandiuzzi’s
company grows. We acquired several experience in
the steel construction from power to oil & gas sector,
and later, also the naval sector became a knowledge.”
Scandiuzzi has crossed many challenges, but we think
that the philosophy that has always distinguished us is
that we have been able to meet the challenges of the
Above Two example of the screen’s software controlling the ShipLift future. The ShipLift was a challenge overcame and we
operations are ready to start a new.