Page 84 - Industrial Plants
P. 84

•   Intermediate system, comprising the filtered water   •   Waste water treatment systems, the backwash
                                 tank, the intermediate pump station.     waste water basin, the clarifier feed pumps, the
                             •   SWRO system, comprising the cartridge filters, the   coagulation/flocculation chambers along with the
                                 RO membrane trains, the high Pressure pumps,   required mixing devices and chemical dosings, the
                                 the Energy recovery devices, along with the ERD   lamellar settling decanter, the sludge thickener, the
                                 Booster pumps and sodium metabisulphite and   sludge homogenization tank, the dewatering
                                 anti-scalant dosing systems.             centrifuge decanters  along  with the feed  pumps
                             •   RO CIP comprising the CIP tanks, the Flushing   and chemical dosing.
                                 tank, the CIP/flushing pumps, the Cartridge filter,   •   Effluent outfall collectors, the outfall chamber and
                                 the Chemical preparation tank & Transfer pumps.  two pipes with diffusers until the off-shore waste
                             •   Post treatment system, comprising the CO 2   discharge point.
                                 storage and dosing system and the Limestone
                                 filters for re-mineralization, and final chemical   Again, additional facilities included in the project scope
                                 dosing with caustic soda for pH adjustment,   are: firefighting system, air conditioning and ventilation
                                 sodium hypochlorite for disinfection and sodium   system and other ancillary systems.
                                 fluoride.







                             Alberto Zecchin



                             Alberto Zecchin has graduated in Chemical Engineering   supported the Qatari RasGas company (today Qatargas)
                             at the University of Padua in 2003. In 2005/2006 he   as  an  independent  technical  advisor  for  the TIPW
                             attended the second level international Master course   project.
                             on “Innovative membrane technologies & conventional   Since his return in Fisia Italimpianti in 2017 he took part
                             processes for waste and drinking water treatment”   to the design phase of seawater reverse osmosis
                             organized by the University of Genoa.    projects of Shuaibah III Expansion II and  Salalah as
                             Following an earlier employment in various companies   Deputy Process Manager. He assumed the role of
                             as water and industrial wastewater treatment plant   Commissioning advisor for Mirfa revamping project and
                             designer and commissioning engineer, he entered Fisia   of Deputy Commissioning manager for Shuaibah III
                             Italimpianti  S.p.A.  in  200  and he  specialized  in   Expansion II. From 2019 he is the Process Manager for
                             desalination technologies.               the bidding and execution phase of Ghubrah III project.
                             He worked for Saipem between 2012 and 2015 on Oil   Since 2020 he has taken on the role of Process
                             & Gas Front End Engineering and execution  projects on   Coordinator for all the Reverse Osmosis projects in Fisia
                             water and wastewater treatment, and in 2016 he   Italimpianti.































            IndustrIal Plants - May 2022
    82
   79   80   81   82   83   84   85   86   87   88   89