ENGINEERING/ 1






                                                                      appointed to perform the activity, the defi nition of
                                                                      Construction specifi cations (including those impo-
                                                                      sed by Local Authorities) , the way to manage Plant
                                                                      Material, etc..
                                                                      In this phase, the Design and Construction codes
                                                                      defi nition as well as best practices from  previous
                                                                      similar Projects’ feedback are essential.
                                                                      Periodical  dedicated  meeting  with  the  Client  are
                                                                      also needed to better defi ne stakeholders expec-
                                                                      tations.
                                                                      Subcontracting
                                                                      In a typical EPC project, the Main Contractor sub-
                                                                      contracts part of the scope of the work to one (ge-
                                                                      neral) or more (discipline) Subcontractors.
                                                                      Regarding the Bolt Tightening task, it is normally
                                                                      appropriate  to hire a specialized Company as pro-
                                                                      vider of Bolting related Services, such as for exam-
                                                                      ple:
                                                                      •   Prepare or review operative procedures;
                                                                      •   Design or Review calculation notes;
                                                                      •   Tightening Personnel Training;
       Fig. 1 – Bolt Tensioning
                                                                      •   Site activities supervision;
                                                                      •   Inspection, testing and traceability;
                            Construction and quality
                            integrated system

                            As per International Standards, the Quality system
                            requirements have to be integrated with the mana-
                            gement of some main topics as, for example:
                            •   Contractual provisions and technical review;
                            •   Sub-Contracting;
                            •   Construction Specifi cations;
                            •   Plant Material;
                            •   Personnel qualifi cation;
                            •   Quality Control Plans defi nition and implemen-
                                tation.
                            Contractual Provisions and Technical Review
                            Considering a defi ned contract frame between
                            Contractor  and Client, the  fi rst step   to consider
                            is the review of the contractual requirements, in-
                            cluding those pertaining to Bolt Tightening to be
                            matched during the Project execution.
                            This step is fundamental to correctly defi ne the
                            strategy and properly manage the Subcontractors
                                                                      Fig.2 - Bolt Tightening with Manual Wrench


                                  Construction                        It remains Main Contractor’s responsibility, in any
                                   Process                            case, to ensure the compliance with all applicable
                                 Management
                                                                      Project Requirements.

              Quality System                        Subcontracting    Construction Specifications
               Management        Bolt Tightening     Management       Typically (Main) Contractor reverts the Project Re-
                               Integrated System                      quirements within the Construction specifi cations
                                                                      needed to prepare the operative work instructions.
                                                                      The Construction specifi cations list all the applica-
                     Personnel                   Material             ble requirements, such as for example:
                    Management                 Management             •   Design and Construction Codes;
                                                                      •   Flanged Joints criticality criteria;
                                                                      •   Training and qualifi cation of personnel;
                                                                      •   Preliminary activities and assembly of Flanged