Page 48 - Impiantistica Industriale
P. 48
ENGINEERING/ 1
Integrated Management
System for Piping
Flanged Joints
A schematic description of an Salvo Bazzano, Manager, Construction ge in Engineering up to final release be-
fore Commissioning and Start-up phases,
QC & Methods, Technip Italy S.p.A.
integrated system regarding Andrea Iacobelli, Head of Construction, along the natural life of an Oil and Gas
EPC project or similar.
the management of the Piping Technip Italy S.p.A.
Member of the Executive Committee of
Flanged Joints, developed by the Construction Section of ANIMP Definition and attribute
Technip Italy S.p.A he piping bolted Flanged Special Process
for EPC Project in Oil & Gas Joint Assembly as complex Piping Bolt Tightening works could be
element has to be subject
considered a special process where the
and Petrochemical Sectors to a sensitive process of De- Quality of the final outcome, i.e. Flanged
sign, Construction Manage- Joints, cannot be evaluated just during fi-
T ment and Quality Control. nal inspection.
The overall process involves the correct An integrated management system has to
definition of all the phases from early sta- embed requirements relevant to the verifi-
44 Impiantistica Italiana - Settembre-Ottobre 2021

