enhances the peaker capabilities of gas turbines by   traditional operating efficiency without impacting start-
            substantially expanding their operating range, thanks to   up times, and to integrate the possibility of arbitrage, as
            the integration of a CO  bottoming cycle combined with   an additional service.
                            2
            a storage system. The hybrid configuration of a gas   Both CO  Battery and ETCC have a plant configuration
                                                            2
            turbine integrated with an energy storage solution   that integrates a power train consisting of rotating
            allows the resulting combined cycle to be operated   machines with a part of the plant aimed at the efficient
            both with peaker functionality and for arbitrage   management of storage systems, combining in an
            purposes, supporting the electricity grid in compensating   innovative way some typical power generation
            the volatility of renewable energy generation or resolving   components with other specific elements, to ensure
            grid congestion.                         maximum operational  flexibility  and  full  process
                                                     reversibility.
            The ETCC configuration is also available  as add-on,   This functional separation reflects in the possibility of
            applicable to existing gas turbines in an open cycle   sizing the system power independently of the operating
            configuration: the upgrade makes it possible to increase   duration of the storage system, thus allowing the