Page 64 - Industrial Plants
P. 64

Figure 3 - ORF
          configuration for early
          production Phase 1




















          Figure 4 - ORF
          configuration for full
          field production Phase
          2 (post FPSO
          installation)


                                                                       activities took place in total safety. A massive
                             ORF is actually configured in early production asset   commitment of resources dedicated to this issue has
                             (phase 1), the multiphase product is sent to the ORF by   made it possible to carry out the activities without
                             a multiphase sea line. After the FPSO arrival and during   infections.
                             the integrated commission activities it has been    In order to optimize the shutdown activities and avoid
                             considered to convert in final asset the ORF receiving   any delay for the start-up, the WP2 activities will be
                             system (phase 2) as below:                performed:
                             •   Phase 1: ORF is a multiphase receiving facilities,   1.  Multidisciplinary Site survey;
                                 working with 3 separators in parallel at ~4 barg,   2.  Material verification for company provided items;
                                 measuring  all streams,  compressing  gas  up  to   3.  Material preparation/storage for shutdown
                                 50-60 barg and finally exporting the 2 streams   activities;
                                 (see Fig. 3);                         4.  Piping and support metrology and pre-fabrication;
                             •   Phase 2: ORF is gas + condensate receiving   5.  New cable routing (cable tray and cable pulling);
                                 facility, working at ~60 barg with a single   6.  Scaffolding area identification and erection.
                                 separator/slug catcher (VQ001), measuring gas
                                 and condensate streams and finally export them   Before the preparation activities for the “shutdown” of
                                 jointly in a single wet gas pipeline (see Fig. 4).  the plant, the following activities were coordinated:
                                                                       •   Prefabrication of new pipes, supports, laying of
                             The work phases have been planned and scheduled in   cable trays;
                             such a way as not to compromise mainly the health of   •   Mobilization of housing for the “camp”;
                             the workers, the surrounding environment and   •   Mounting of scaffolding, “Pigging” and sealine
                             compliance with execution times. The anti-Covid   depressurization;
                             procedures prepared by DG IMPIANTI for all site   •   Shutdown  activities,  field  assembly  of pipes  /
                             personnel,  have  meant  that  the  execution  of  the   equipment, alignment of the instrumentation

            IndustrIal Plants - May 2022
    62